Saunier Duval THELIA 23 Instrukcje Operacyjne

Przeglądaj online lub pobierz Instrukcje Operacyjne dla Sprzętowe akcesoria chłodzące Saunier Duval THELIA 23. Saunier Duval THELIA 23 Operating instructions Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - 01773 828400

1THELIATHIS IS A CAT II2H3+ APPLIANCE01773 828100IN WARRANTYTECHNICAL HELPLINE01773 828400

Strona 2

10TECHNICAL DATATHELIA 23THELIA 23 ETHELIA SB 23Heating useful output, adjustable from... (kW) 8,9 8,9 8,9(BTU/H) 30,000 30,000 30,000to...

Strona 3 - INTRODUCTION

11DIMENSIONSOPENING THE CONTROL PANEL COVERHab 129Hab 132THELIA 23, THELIA 23 ENet weight : 41 kgGross weight : 43 kgTHELIA SB 23Net weight : 40 kgGro

Strona 4 - CONTROLS AND LIGHTING

12BOILER SCHEMATICShy 067aDiagram. 21THELIA 23, THELIA 23 EABCDF4305612142119318171516789101113232212201-"ON" push - button.2-"OFF"

Strona 5

13Shy 068aDiagram. 22THELIA SB 2314 - Multi - functional control.16 - Hight limit thermostat.17 - Ignition electrode.18 - Pilot19 - Hot water thermist

Strona 6 - CLOCK - INSTRUCTIONS FOR USE

14THELIA 23, THELIA 23 EFrom left to right, the connection plate is equipped with :THELIA SB 23From left to right, the connection plate is equipped wi

Strona 7 - CLOCK - INSTRUCTIONS FOR USE

15Water connectionConnect the water pipes to the fixing jig con-necting plate using the copper tails supplied.Warning : To prevent damage to the isola

Strona 8

16DOMESTIC HOT WATER SYSTEM DESIGN● Copper tubing must be used for the domestichot water system. Unnecessary pressure lossesshould be avoided.● The bo

Strona 9 - SERVICING/MAINTENANCE

17BOILER LOCATIONVen 060aNCDMOPABEFGIHLDiagram. 26A-under a window ...

Strona 10 - TECHNICAL DATA

18The boiler is supplied for rear outlet flue connec-tion.Alternatively, the boiler is designed to allow theflue system to be connected to the top of

Strona 11 - DIMENSIONS

19Important : when cutting the flue hole and whenextending the flue centre line to a side wallremember that the flue system must have a fall ofabout 3

Strona 12 - THELIA 23, THELIA 23 E

2INSTALLATION AND OPERATING INSTRUCTIONSTHELIA 23, THELIA 23 E, THELIA SB 23Mandatory warning notice for CEE countriesWARNING, this appliance was desi

Strona 13 - THELIA SB 23

20Refer to table 1 for the cutting lengths of both thePVC and the aluminium flue pipes for each of thevarious flue options available.Important. All cu

Strona 14

21Diagram 38Locking fitting endDiagram 39Installation of flue assembly● Fit the PVC pipe (A) into the wall with lockingfitting end to outside.● Fit th

Strona 15 - HEATING SYSTEM DESIGN

22TOP OUTLET FLUE ASSEMBLYTop outlet flue - Kit 85089The boiler is supplied for rear outlet flue connec-tion. For a top outlet flue :● Unscrew and r

Strona 16 - Diagram. 25

23TOP OUTLET FLUE ASSEMBLYCalculation of flue cutting lengthsMeasure the wall thickness e (mm)For side flues, measure distance from inside faceof the

Strona 17 - Diagram. 26

24ELECTRICAL CONNECTIONwire link fitted between the top two terminals ofthe connector is left in place, see diagram 50a.A 230V room thermostat can be

Strona 18 - REAR OUTLET FLUE ASSEMBLY

25ELECTRICAL CONNECTIONNo external controls No external controlsRoom thermostat onlyRoom thermostat onlyRoom thermostat and time clockFactoryfitted li

Strona 19 - E F D C B A

26COMMISSIONINGThe commissioning and first firing of the boiler mustonly be done by a competent person.Gas installation● It is recommended that any ai

Strona 20

27● Turn the knob (dia-gram. 56) to switch theboiler ON and OFF: cloc-kwise to increase thetemperature, anti-cloc-kwise to decrease. Theburner will au

Strona 21

28OPERATING SAFETY DEVICESAir flow rate safety deviceIf an obstruction, even partial, of the flue occursfor any reason whatsoever, and causes reductio

Strona 22 - TOP OUTLET FLUE ASSEMBLY

29SETTINGSBypassThe built-in bypass must be adjusted accordingto the requirements of the system. Refer to the flowrate pressure curve (diag. 19 p. 11)

Strona 23

3INTRODUCTIONThe boilers have a fan assisted balanced fluewhich both discharge the products of combustionto and draws the combustion air from the outs

Strona 26 - COMMISSIONING

32“Le Technipole” - 8, av. Pablo-Picasso - 94132 Fontenay-sous-Bois cedexTéléphone : (1) 49 74 11 11 - Télex : 262 958 - Télécopie : (1) 49 74 11 0110

Strona 27

4Diagram. 1OPENING THE CONTROL PANEL COVERCONTROLS AND LIGHTINGHab 129Lighting the THELIA 23 and THELIA SB 23 boilers+1 / ON1 / ON3 - Wait for20 secon

Strona 28 - SETTINGS

5THELIA SB 23THELIA 23, THELIA 23 E● Hot water : Turn theknob (diagram. 5) in or-der to obtain a watertemperature suited tothe demand.Reg 012Diag. 5R

Strona 29 - CHANGING GAS TYPE

6Saunier DuvalAUTOTIMERC1onoff enterres12.00Diagram. 11Saunier DuvalAUTOTIMERC1onoff enterres13.00Diagram. 12Saunier DuvalAUTOTIMERC1onoff enterres7.5

Strona 30

7To Set Your Own Programme "On" and "Off" TimesNote. The timeclock can be set to give a minimumof one and a maximum of three &quo

Strona 31

8CLOCK - INSTRUCTIONS FOR USETo Check the Programme "On" and "Off" TimesThe programmed "On" and "Off" times ca

Strona 32 - 102740 D 08/96

9Protection against freezingIf the boiler is to be out of use for any long periodsduring severe weather conditions, it is recom-mended that the whole

Komentarze do niniejszej Instrukcji

Brak uwag